500 Tph Stone Crusher Italy

Regular inspections should be taken to observe the working conditions and bearing temperatures of the various components of the crusher by means of viewing, listening, and touching.Usually, the bearing temperature must not exceed 60 to prevent the alloy bush from melting or being burnt tile accident.When it is found that the bearing temperature is very high, do not stop the operation immediately.Effective measures should be taken to reduce the bearing temperature in time, such as increasing the oil supply, forced ventilation or water cooling.After the bearing temperature drops, it can be stopped for inspection and troubleshooting;.

This drum crusher and in-drum compactor crushes drums into easily managed 4" 'pancakes', capable of being removed with an easy-to-use forklift.

The hammer crusher should be assembly combined and past the testing.And we should operate according to the related materials and then positioned properly (the corresponding mold of the basic pictures should be sent along with the products).

Therefore, one coal can be used to crush only 1 ore, and that 64 coal are required to crush an entire stack of ore and crushing a full stack of ore takes just over 34 minutes using this crusher.

With years of engineering experience, mclanahan is able to recommend and provide the correct jaw crusher for your application.

The other one is cone slag crusher, which is is ideally used for crushing slag in the secondary process after jaw crusher.The material crushed through jaw crusher will be fed into cone slag crusher.

NEED A QUESTIONS?

If you are interested in our products, or have any questions for us, you can click the button below

Contact Us

Your demand

Contact Information

Zhengzhou High-tech Zone, China

[email protected]

Related Blogs

Copyright© 2020 DRiveOn machinery.All rights reserved. Sitemap